WGC Landscapes Ltd was commisioned in July 2010 to design and construct an outdoor equestrian school for a private livery yard.
Client : Private
Designer : WGC Landscapes Ltd
Contract Value: £17,600
Contract Duration:3wks
Excavation for a 20m x 40m arena
begins in preparation for laying and
levelling of sub base.
Fencing is put in place and
drainage installed
Sand and rubber crumb surfaces
are laid on geotextile membrane
with bonded joints
Surfacing and fencing works are
completed prior to access
reinstatement.
The School is ready for use as a new facility for the livery yard